About the Project
Mrs A purchased a new build home and found the 2x bedrooms on the 2nd floor were like Saunas in the Summer – with limited space above the door frames we had to choose small height indoor units and so chose the Mitsubishi Heavy Industries SKM Range of Systems. 2x Indoor Units have been connected to 1x Multi Type Outdoor Unit , We encased the external pipework in black trunking to finish off a Professional Installation