About the Project
Mr T purchased a house on the outskirts of Guildford and planned to rent the house out, wanting to maximise his return & rental sum he asked us to install A/c systems into the Ground Floor Living Rooms & Upstairs Bedrooms. A total of 13x rooms which consisted of 2x 6way Multi Split Systems (6x indoor units connected to 1x Outdoor Unit) and 1x Single Split System. Systems chosen were by Mitsubishi Heavy Industries.
Downstair Units chosen were high wall mounted units and all 1st floor bedrooms had individual ducted units mounted in the loftspace above, all that is visible within the bedrooms are the supply & return air grilles and the Infra-Red Controller Receiver Unit
All work including the required electrical work was carried out by Climachill Engineers over the course of 2x weekends